07 Oct UXO campaign Fehmarnbelt Tunnel project
Since 2019 Deep has been deployed in the Baltic Sea working for Fehmarn Belt Contractors I/S. Deep is performing a geophysical site investigation of the Fehmarnbelt tunnel trench, work harbor and access channel.
The objective of the survey is to provide a full assessment of geophysical anomalies caused by objects in or on the seabed. The purpose of the nearshore and offshore survey is to assess whether potential UXO’s are along the tunnel route, and to assess the level of UXO mitigation measures needed to reduce the risk.
credits drone movie: Akul Chopra, editing: Erik Fijlstra